Public methodology note

Job title ≠ role ≠ responsibility

Construction teams often say “the general contractor owns this”, “that is supervision’s responsibility” or “let the project manager decide”. A company, a job title and a specific project role are different things. At the moment of decision, the project needs a named person with defined authority.

15 October 2026MEGAPROJECT / Methodology9 min read
Key points
  • A company is not a substitute for a named role holder.
  • A job title is not the same as authority.
  • Many people may advise, but accountability must remain clear.
01

A participant is a party; a role is a function carried by a person

One legal entity may have a director, project manager, site manager, estimator and engineer on the same project. They represent one party but perform different functions. “The contractor is responsible” is therefore not enough for control.

A role should be tied to a project context, work package, function type, named person, represented party, authority basis and validity period.

02

A job title does not create authority automatically

The title “project manager” can carry very different limits in different organisations. One PM may resequence work within an approved baseline; another may need approval for minor deviations.

Before controlled execution, define who sets requirements, releases work, allocates resources, accepts results, changes baselines and approves financial consequences.

03

One action needs one clear accountability holder

When the same role is effectively carried by three people at once, decisions become diffuse. Everyone assumes someone else will close the issue, while later everyone refers back to the group discussion.

Many people may advise or co-approve, but operational accountability for a specific role in a specific context should be unambiguous.

04

Executor, controller and authorising role are different functions

The executor delivers a result. The controller checks it against defined criteria. The role authorised to change budget, contractual basis or core requirements may be someone else entirely.

Mixing these functions creates self-acceptance, uncontrolled resource decisions and technical instructions outside authority. Role separation reduces ambiguity, not trust.

05

Authority needs limits and substitution rules

Construction cannot stop whenever one person is unavailable. Critical roles need explicit authority limits, thresholds and substitution rules.

Substitution should also prevent a temporary participant from receiving wider authority than the primary role holder.

06

Personal accountability does not mean personal blame

The purpose is not to find someone to punish. It is to make management workable: who owns the next action, who can decide and where escalation is required.

A clear role system exposes overload, authority conflicts and missing decision owners before they become project failures.